HDPE (High-Density Polyethylene) pipes can be connected in various ways depending on engineering requirements, pressure ratings, and construction conditions. Below are the common HDPE pipe connection methods and their characteristics:
Application: Pressure pipe systems (e.g., water supply, gas pipelines)
Advantages: Strong sealing, high joint strength (close to the pipe material itself)
Disadvantages: Requires specialized equipment and trained operators
Type | Key Steps | Applicable Pipe Sizes |
Butt Fusion | Heats pipe ends to a molten state, then presses them together (requires trimming, temperature control at 200-220°C) | DN20-DN1200 |
Electrofusion | Uses fittings with built-in heating wires (automated temperature control, suitable for confined spaces) | DN20-DN400 |
Socket Fusion | Simultaneously heats pipe end and fitting before insertion (common for small-diameter pipes) | DN20-DN110 |
Application: Temporary projects, non-pressure pipelines, or repairs
Advantages: Quick installation, detachable
Disadvantages: Requires periodic sealing inspection
Type | Features |
Flange Connection | Bolted flange connection with gasket sealing, suitable for valve/equipment connections |
Clamp Coupling | Uses stainless steel clamps to compress rubber seals, ideal for emergency repairs or connecting different materials |
Compression Fitting | Seals via threaded compression, typically used for small pipes (DN ≤ 63) |
Method | Description |
Steel-Plastic Transition Fitting | Connects HDPE to metal pipes (internal sealing and anti-pullout structure) |
Heat-Shrink Sleeve Connection | Uses a heat-shrink sleeve to seal joints by flame heating (common for cable protection pipes) |
Pressure pipelines: Prefer heat fusion (Butt Fusion > Electrofusion)
Non-pressure pipelines: Mechanical connections are more economical (e.g., clamp couplings for drainage pipes)
Special environments:
Underground concealed works → Heat fusion
Confined spaces → Electrofusion
Temporary projects → Flange/Clamp connections
Clean pipe ends before heat fusion to avoid contamination.
Mechanical connections require periodic seal inspection (recommended replacement every 5 years).
Official website: www.phtopindustry.com | www.pefitting.net
Contact us: Email:inquiry@phtopindustry.com | Whatsapp:+86 15093100892
Company address: Room 802, 8th Floor, Building 5, Jinyin Modern City, Jinshui District, Zhengzhou City, Henan Province, China